Acrylic Distempernew

 

Description:
Acrylic Distemper is a water-based, interior wall paint and gives walls a delightful, attractive, matt finish that lasts for ages. A time-tested formulation with acrylic copolymer binder, its special formulation ensures shade retention for a long time and its fast drying property facilitates quicker completion of painting jobs.

Directions For Use:

  1. 1. Surface Preparation: Sand the surface with Emery Paper 180. Clean it. Primer is not required as a base coat.
  2. 2. Putty: Apply 2 coats of putty to smoothen the surface to remove the undulations in the wall by filling with Everplast Acrylic Wall putty, Cement based putty or Mineral based powder putty depending on the type of surface i.e cement plaster, POP/gypsum, etc.
  3. 3. Drying: Allow drying for 4 to 6 hours. Sand the surface with Emery Paper 180 and clean it.
  4. 4. Primer: Apply a single coat of Ever Prime (Everplast Acrylic based water primer), to increase the coverage of the paint. Allow drying for 6 to 8 hours.
  5. 5. Top Coat: Dilute a kilogram of Everplast Acrylic Distemper with 60-65% water, by adding it slowly to the paste and stirring the mixture continuously. Apply 2-3 coats of paint with an interval of 3 to 4 hours, between consecutive coats.

Coverage:
The coverage on smooth primed masonry surface with recommended application procedure is 18 to 20 sq mt/kg for 1st coat application and 9 to 12 sq mt/kg for 2nd coat application.

Drying Time:
Surface dry time, approx. 30 minutes.

Gloss Level:
Matt finish.

Flash Point:
As Everplast Acrylic Distemper is a water based paint it is non-flammable.

Shelf Life:
3 years from the date of manufacture in original tightly closed containers away from direct sunlight and excessive heat.

*Practical spreading rate may vary from the quoted theoretical spreading rate due to factors such as method and condition of application and surface roughness.

Packing Size:
Available in 1 kg, 5 kg & 20 kg buckets.

Maintenance Tips:
1. For removing stains, sponge with a mild soap solution and clean.
2. Ensure a drying time of 2 weeks before cleaning.



Office Address:
Unit No.1, Tare Compound,
Opp. Dahisar Octroi Naka,
Behind Krishna Restaurant,
Near Dahisar Check Post
Mumbai - 400 068.

Contact: Bharat Sachanandani
+91 98206 28597
bharatsach@everplast.in

Contact: Ashwin Sachanandani
+91 98206 28513
ashwinsach@everplast.in